Skip to main content
Back

Stars Over the River Drin

Rating
10.0
The Film

Stars Over the River Drin

The Story

After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.

Runtime

69 min

Released Apr 1978
The Ensemble 7

Gallery

The Stills.

View All
Film backdrop
Activity

Performance

Global Pulse

Live

Top Curators

Latest Reviews

View all

No reviews published